You want to lay the shingles from the bottom to the top of the valley.
How to shingle peak of hip roof.
Insert staples with a hammer stapler 12 inches apart along the top and bottom edges of the felt paper as you roll it out along the roof.
Use the shears or utility knife to cut three tab shingles into three separate shingles to use as cap shingles for the hip roof.
Three bundles of three tabbed shingles equal one square or 100 square.
For trapezoidal roofs measure the bottom edge the top edge also known as the ridge and the distance between the 2 edges.
You will also want to place them on top and do your best to center them on a seam between two on the previous row.
There are a number of key steps you need to take to avoid mucking this part up.
Then your first shingle goes on the side you are going to cut.
The guys would cut a second shingle to overlap the back half of the first one.
The starting shingles for each row will typically be halved at the ridge of the hip roof as you ascend.
Start by overlapping a starter from both sides of the valley at the bottom.
As you place each new row make sure the center of the next shingle up overlaps the previous row by 2 3 of the total length.
Step 4 continue rolling out the felt until you reach the roof hip on the other end.
Adjust the bottom of the felt if necessary to keep it flush with the gutter apron.
Weave and cut the valley on the highest side of the roof.
The next one goes on the low side.
After both hips were finished the guys would place a shingle along the ridge.
Determine the width of the shingle pieces and snap a line a little less than half that dimension on one side of the hip or ridge peak then align the side of the shingles along that guide.
Find the dimensions of each of the roof s faces.