Curb and gutter stakeout for a thoroughfare that will have a curb and gutter these items are usually constructed before the finish grading is done.
How to stake curb and gutter.
48 bull float reinforcing bar cutters 5 cubic foot mixing box with mortar hoe.
Prepare and form pour from truck and finish 6 tall by 12 wide curb.
Additional cost for gutter net 6 tall x 24 base for higher volume drainage.
Item unit cost quantity line cost.
Curb and gutter built on soft soils may re q u i r e re i n f o r cement two 4 bars placed longitudinally to limit c r ack widths and settlement.
The staking contractor must always consult with the curb gutter curb and gutter or concrete barrier wall contractor and check with engineer for changes to the approved plans before doing any staking or grade computations.
In a curb and gutter that settles tilts or cra c k s.
The stake is driven so that it slopes away from the fill or cut and is marked with its horizontal distance left or right from the centerline and the vertical distance from the ground at the stake to the finish elevation.
Perimeter form boards and stakes.
Concrete curb and gutter installation equipment allowance job related costs of specialty equipment used for job quality and efficiency including.
The surveyor should follow these steps when staking curb gutter curb and gutter or barrier wall.
This re i n f o r cement is con tinuous through contraction joints but stops at expan sion joints.
The curb constructors obtain their line and grade from offset hubs like those described previously.