Keep the ends of starter strips at least 1 4 6 4mm apart to allow for expansion fig.
How to staple vinyl siding.
Center the fasteners in the slots to allow for expansion and contraction.
Secure the panels with a nail every 16 inches 40 6 cm or so remembering to center the nail in slot and leave 1 16 of the nail head above the vinyl siding to allow for movement and expansion.
April 12 2015 at 6 06 pm 316003.
Between nail head and vinyl.
Slide the bottom row of panels into place making sure to hook the bottom lip of each panel under the starting strip.
Start fastening in the center of the panel and work toward the ends.
You can use a hand powered staple gun but both nails and staples must penetrate the backing.
Vinyl siding stapler offers good holding capability.
Play at both ends so if it s nailed properly loosely you should be able to slide it 1 4 to 1 2 in.
Center nails in slots.
The staple install seems to make the siding oil can a lot.
When applying vinyl siding staples must penetrate the backing wood by inch yet leave a gap of about 1 32 inch between fastener and siding.
For insulated siding the.
Put vinyl siding up at least 10x faster using this pneumatic tool with new pre set technology.
This gives staples applied with a vinyl siding staple gun a good quality and holding capability.
If all the siding is tight it was installed wrong and should be redone.
Manufacturers require about 1 4 in.
Nail in the center of the starter strip nailing slots.
Place all other fasteners in the center of the slots.
A staples wider head allows the siding to flex more.
I have yet to read a manufacture recommend instal method that includes staples.
Using the chalkline as a guide install the top edge of the starter strip along the chalkline nailing at 10 254mm.
Do not nail to the extreme right or left of nail slot in siding panel.
If you are installing vinyl siding manually with no power tools then nails are your only real option.
I have fixed lots of siding jobs that were stapled.
Drive nails straight and level.
Allow approximately 1 16 in.
Start fastening vertical siding and corner posts in the top of the uppermost slots to hold them in position.
Simply go outside grab the lower edges of a siding course and try to slide it back and forth photo 1.